we are open

Information Tobler AG to our customers about the Coronavirus COVID-19

Dear customers

While the coronavirus COVID-19 continues to spread in Europe and Switzerland, Tobler AG continues to actively monitor the situation. The effects on humans, the economy and leisure time are hardly predictable, and states are imposing new measures and regulations almost daily. In large parts of the world, events have been banned and businesses closed until April, as well as hygiene measures to continue the construction industry.

The Tobler AG does everything to ensure the usual services for all our customers. We cannot guarantee however at present that this is always and completely possible. Even if the transit and goods traffic is still permitted, we expect due to the entry/exit regulations and the introduced intensified border controls with delays in delivery.

We hope that we can count on your support in finding a suitable solution when the undesired case occurs. We ask you to keep us proactively informed about what is happening in your company in case you have to postpone or cancel orders. We ask for your understanding in this exceptional situation.

Martin Tobler
CEO

The top wall circuit for each application.

Flexibility despite modularity.

Tobler Top is a robust multiple area formwork, which is suitable for almost any concreting job. Thanks to four standard heights (0.60 - 1.20 - 2.70 - 3.30 m) and element widths from 0.24 to 2.40 m, even demanding projects can be implemented efficiently.

The elements are connected with a handy formwork terminal. For the length adjustment, wall offsets, cornering profiles, obtuse angles or raisings, practical balancing, universal, corner and joint elements as well as the balance bar 85 are available.

New enhanced construction

The newly designed steel frames have been additionally enhanced and are characterised by an increased steel quality of the class 400S. They have integrated full cast corner profiles and are designed for fresh concrete pressure of at least 80 kN/m2. In the corner areas, internal corner profiles are also welded in. All seams are welded with a robot.
The anchor binding positions are fitted with a stable steel cone and corresponding steel sleeves. This means that the deficiency-prone plastic anchor sleeves are no longer required and the formwork obtains additional stability.

Executed to measure

The steel frames are available in a standard powder-coated design, and optionally in a galvanised design. The steel skin is made from birch veneers, plywood, which meets the highest quality requirements.

The plates are glued crosswise in accordance with the BFU 100 norm and coated with a phenol resin film (220g/m2). Plastic-coated plates are also optionally available as well as full-plastic plates (alkus).

Compatibility with a system

The Tobler Top wall formworks are compatible with many standard systems and can be easily combined with third-party components, for instance with PERI TRIO, SCHALTEC TRITION or GHI TRITEC.

If you opt for Tobler Top, you can continue to use your previous system.

Field Service Switzerland

Patrice Eggermann

Patrice Eggermann

Sales field service Formwork
VD, GE, JU, NE, FR, VS, BE
French-speaking part
T: +41 (0)79 220 99 97
patrice.eggermann@tobler-ag.com

Suat Ismaili

Suat Ismaili

Field Service Formwork Sales
AG, AI, AR, BL, BS, FL, GL, GR, LU, NW, OW, SG, SH, SO, SZ, TG, UR, ZG, ZH
T: +41 (0)79 690 36 13
suat.ismaili@tobler-ag.com

Field Service Abroad

Martin Tobler

Martin Tobler

CEO
T: +41 (0)71 886 06 06
info@tobler-ag.com

Hans Mariani

Hans Mariani

Gebietsverkaufsleiter Süddeutschland
T: +49 170 88 60 614
hans.mariani@tobler-ag.com

Markus Hirzinger MSc MBA

Markus Hirzinger MSc MBA

Vertriebsleiter Österreich
T: +43 664 158 8954
markus.hirzinger@tobler-ag.com

Michael Lampert

Michael Lampert

Vertriebsleiter Vorarlberg & Tirol
T: +43 676 603 7360
michael.lampert@tobler-ag.com