we are open

Information Tobler AG to our customers about the Coronavirus COVID-19

Dear customers

While the coronavirus COVID-19 continues to spread in Europe and Switzerland, Tobler AG continues to actively monitor the situation. The effects on humans, the economy and leisure time are hardly predictable, and states are imposing new measures and regulations almost daily. In large parts of the world, events have been banned and businesses closed until April, as well as hygiene measures to continue the construction industry.

The Tobler AG does everything to ensure the usual services for all our customers. We cannot guarantee however at present that this is always and completely possible. Even if the transit and goods traffic is still permitted, we expect due to the entry/exit regulations and the introduced intensified border controls with delays in delivery.

We hope that we can count on your support in finding a suitable solution when the undesired case occurs. We ask you to keep us proactively informed about what is happening in your company in case you have to postpone or cancel orders. We ask for your understanding in this exceptional situation.

Martin Tobler
CEO

The leightweight scaffolding for smart calculators.

Fo sure more economical.

The MATO 1 facade scaffolding is one of the few systems that can be installed with only four main parts thanks to double railings. This not only has a positive effect on safety but also on the costs. The scaffolding frame is available in widths of 70cm and 100cm. All system components are compatible with one another. Our products are consistently monitored by an independent third party, the Karlsruhe Institute of Technology (KIT).

As strong as necessary - as light as possible!

MATO 1 is a contemporary lightweight system, which was developed specifically for the increased commercial requirements in scaffolding construction. Depending on the construction height and maximum load, steel frames with a wall thickness of 2.7mm or aluminium frames with a thickness of 4mm are used. The steel design allows construction heights of up to 80m and higher, the aluminium version allows heights of up to 40m and higher. For particularly heavy loads, frames with wall thicknesses of 3.25 are available. They are compatible with the normal lightweight frames.

Time and cost savings of up to 30%.

Experience in practice has shown that up to 30% of time can be saved with contemporary lightweight scaffoldings compared to traditional heavy systems. With consistently increasing cost pressure, this is an important factor for success. But the lightweight design not only has significant benefits when installing the scaffolding. Thanks to the low weight, the load volume during transport is increased, handling becomes safer and storage is easier.

Field Service Switzerland

Armando Martins

Armando Martins

Sales field service Scaffolding
VD, GE, JU, NE, FR, VS
French-speaking
T: +41 (0)79 795 10 37
armando.martins@tobler-ag.com

Christian Mühlethaler

Christian Mühlethaler

Sales field service Scaffolding
BE, SO, LU, OW, NW, FR, VS
german
T: +41 (0)79 776 41 29
christian.muehlethaler@tobler-ag.com

Sascha Tischhauser

Sascha Tischhauser

Sales field service Scaffolding
SG, GR, TG, AR, AI, UR, GL, FL
T: +41 (0)79 395 69 14
sascha.tischhauser@tobler-ag.com

Roman Kipfer

Roman Kipfer

Sales field service Scaffolding
AG, BL, BS, SH, ZH, ZG, SZ
T: +41 (0)79 513 26 60
roman.kipfer@tobler-ag.com

Field Service Abroad

Martin Tobler

Martin Tobler

CEO
T: +41 (0)71 886 06 06
info@tobler-ag.com

Hans Mariani

Hans Mariani

Gebietsverkaufsleiter Süddeutschland
T: +49 170 88 60 614
hans.mariani@tobler-ag.com

Markus Hirzinger MSc MBA

Markus Hirzinger MSc MBA

Vertriebsleiter Österreich
T: +43 664 158 8954
markus.hirzinger@tobler-ag.com

Michael Lampert

Michael Lampert

Vertriebsleiter Vorarlberg & Tirol
T: +43 676 603 7360
michael.lampert@tobler-ag.com