arrow Your advantages

  • Easy for one person to assemble  /  disassemble without tools
  • Low weight due to aluminum design
  • No anchoring required
  • No damage to the building wall as a result of drill holes
  • Easy to handle
  • Reliable, mobile side protection system in accordance with EN 13374, Class C
  • Can be used on the edge of flat roofs
  • Can be used on the edge of roofs inclined up to 45 °
  • Flexible and adaptable
  • Full-length railing braces, welded to the main frame
  • Aluminum toe board
  • Fair price/performance ratio

The Tobler integral console bracket is easy to handle, stable and flexible to use. Together with the special safety railings based on round tubes, it is the perfect choice for working safely and productively on sloped and flat roofs.

The integral console bracked simply hooks onto the gutter or the roof edge. The force is dispersed by means of special facade supports. For more information, see the detailed instructions for construction and use.

 

  

 

Assembling the integral console bracket

The Tobler integral console bracket and its safety railing are designed to provide appropriate fall protection on both flat and inclined roofs. 

The product is suitable as temporary edge protection in the roof area, in accordance with the requirements of EN 13374, for roofs inclined up to 45°. It is used in work areas and foot traffic routes where roofs pitches are greater than 0° and up to 45°, if the fall height is exceeding 2 m.

 

 

Step 1: Hooking and securing

Version 1: Installation in the gutter

  • The integral console bracket is inserted in the gutter.
  • The anti-lift device is positioned underneath the bead fold or another kind of edge on the gutter.
  • The instructions for construction and use must always be followed.

 

Version 2: Attachment to the roof edge

  • The round tubes of the integral console bracket 

    are positioned behind a roof edge that is at least 6 cm high.
  • The anti-lift device is secured by attaching it ­underneath a copper roof edge strip or another type of edge formation.
  • The instructions for construction and use must ­always be followed.

 

Step 2: Bracing the foot plate on the facade

  • A load-supporting, firm and even facade is required for the bracing.
  • The instructions for construction and use must ­always be followed.

 

Storage racks for safe transportation

In the eyes of Tobler, logistics always plays an important role. On construction sites and during transport, time and space mean money. Due to the ever-decreasing numbers of staff on sites, advantages in transport and logistics are becoming more and more important. Tobler is your ideal partner for optimal logistics.

 

Offer enquiry Integral console bracket

Integral console bracket

Item no. Designation Weight piece
Z-615200 integral console bracket 200 cm, aluminum, height adjustable 2,60 – 3,50 m 10,45 kg
Integral console bracket

Safety railing for integral console bracket

• Full aluminum
• Available in sizes 200 cm and 300 cm
• 48,3 mm round tube for detachable connections with the gable protection / gable tubes
• Couplings can be attached at any point
• Optional extension with 38 mm star pipe
• Suitable up to and including Class C
• Refer to assembly instructions

Item no. Length Height Weight piece
Z-616200 200 cm 100 cm 11,30 kg
Z-616300 300 cm 100 cm 16,45 kg
Safety railing for integral console bracket

Aluminum toe board for safety railing

• Aluminum toe board for safety railing Z-616…
• Light and easy to install
• Reinforced aluminum brackets
• Powder-coating and labelling are possible from 100 units combined with other system toe boards (e.g. MATO 1, 2,…)

Item no. Length Weight piece
Z-617200 200 cm 3,40 kg
Z-617300 300 cm 5,15 kg
Aluminum toe board for safety railing

Integral safety bracket for safety railing

• Integral safety bracket for safety railing Z-616…
• Made of steel (6 mm)
• Height-adjustable bracket
• Angle-adjustable hinge
• Compatible with all roof inclines
• The safety bracket is mandatory for roof inclines from 30 ° to 45 °.

Item no. Length Weight piece
Z-616010 75 cm 2,10 kg
Integral safety bracket for safety railing

Storage racks

• Made of steel
• Storage rack for 16 units of safety railings

Item no. Length Width Weight piece
Z-616050 125 cm 64 cm 26,0 kg
Storage racks

Storage racks 2

• Storage rack for 11 integral console brackets (30 linear metres)

Item no. Length Width Weight piece
Z-615050 260 cm 60 cm 45,8 kg
Storage racks 2

All prices net in CHF, excl. VAT and transport, ex warehouse. Tobler AG general terms & conditions apply.

Customer’s details

Your contact in Switzerland

Markus Etter

Markus Etter

Sales Manager Scaffolding
T: +41 (0)79 431 41 30
markus.etter@tobler-ag.com

Hanspeter Fuhrer

Hanspeter Fuhrer

Sales field service Formwork
SZ, ZH, SH, GL
M: +41 (0)79 690 36 13
hanspeter.fuhrer@tobler-ag.com

Sascha Tischhauser

Sascha Tischhauser

Sales field service Scaffolding
SG, GR, TG, AR, AI, UR, GL, FL
T: +41 (0)79 395 69 14
sascha.tischhauser@tobler-ag.com

Markus Hübscher

Markus Hübscher

Sales field service Scaffolding
AG, BL, BS, SH, ZH, ZG, SZ
T: +41 (0)79 513 26 60
markus.huebscher@tobler-ag.com

Eders Dici

Eders Dici

Sales field service Formwork
BL, BS, JU, NE, SO
M: +41 79 102 05 74
eders.dici@tobler-ag.com

Christian Mühlethaler

Christian Mühlethaler

Sales field service Scaffolding
BE, SO, LU, OW, NW, FR, VS
german
T: +41 (0)79 776 41 29
christian.muehlethaler@tobler-ag.com

Patrice Eggermann

Patrice Eggermann

Sales field service Formwork
VD, GE, FR, VS, BE
French-speaking region
T: +41 (0)79 220 99 97
patrice.eggermann@tobler-ag.com

Armando Martins

Armando Martins

Sales field service Scaffolding
VD, GE, JU, NE, FR, VS
French-speaking
T: +41 (0)79 795 10 37
armando.martins@tobler-ag.com

Raphael Helfenstein

Raphael Helfenstein

Sales field service Formwork
VS, ZG, UR, OW, NW, LU
M: +41 (0)76 248 66 39
raphael.helfenstein@tobler-ag.com

Salvatore Pasca

Salvatore Pasca

Sales field service
Scaffolding
TI
T: +41 (0)79 913 60 26
salvatore.pasca@tobler-ag.com

Jonatan Artiles

Jonatan Artiles

Sales field service Formwork
BE, AG
M: +41 (0)76 387 40 89
jonatan.artiles@tobler-ag.com

Peter Hasler

Peter Hasler

Sales field service Storage Technology
M: +41 (0)79 529 84 44
peter.hasler@tobler-ag.com

Field Service Abroad

Martin Tobler

Martin Tobler

CEO
T: +41 (0)71 886 06 20
martin.tobler@tobler-ag.com

Orhan Akgül

Orhan Akgül

Director Business Unit Formwork
orhan.akguel@tobler-ag.com

Mario Page

Mario Page

Director Export International Formwork & Scaffolding
mario.page@tobler-ag.com

Harald Herrndorf

Harald Herrndorf

Head of Sales Germany
T: +49 171 31 51 974
harald.herrndorf@tobler-ag.com

Michael Siebert

Michael Siebert

Area Sales Manager
Northern Germany, NRW, Niedersachsen, Hessen
(Rhein/ Main)
michael.siebert@tobler-ag.com

Daniel Meier

Daniel Meier

Area Sales Manager Thüringen, Sachsen, Bayern PLZ: 90-96
T: +49 171 36 10 482
daniel.meier@tobler-ag.com

Mathias Müller

Mathias Müller

Area Sales Manager
Baden-Württemberg, Bayern PLZ: 80-87, 89
T: +49 151 705 839 72
mathias.mueller@tobler-ag.com

Markus Hirzinger MSc MBA

Markus Hirzinger MSc MBA

Sales Manager Austria
T: +43 664 158 8954
markus.hirzinger@tobler-ag.com

Adrian Lemmermeyer

Adrian Lemmermeyer

Sales field service
Scaffolding and Formwork
Vorarlberg & Tirol
T: +43 676 603 73 60
adrian.lemmermeyer@tobler-ag.com